Thanet House
The Project
The internal fit-out included the provision of new serviced office suites (catering for an occupancy of 500+ people), a new feature reception and entrance walkway, communal breakout facilities at each level, dedicated meeting rooms, gym, shower and toilet facilities.
Category: Wrapped Mouldings
Client: Specialist Joinery
Thanet House
For the Thanet House project, Specialist Joinery needed to meet an unusual specification, with rows of trapezoidal wooden slats lining hallways. Normally, this would be machined from solid wood, or have the veneer pressed onto each surface separately.
Working closely with their project managers and designers, we were able to provide samples to ensure the piece would work with other components in the fit-out. Merenda Surface was able to part-supply the products to allow manufacturing to begin, and supply the remainder of the order as manufacturing proceeded.


What We Did
We supplied over 750 pieces at lengths varying from 2.44m to 3.1m. The project was completed on schedule, and the use of veneer wrapped MDF saved an estimated 30% over the use of solid wood.

